Production schedule replanning
Job order changed on a machine fault or rush order automatically reflows the rest of the week, so the floor works off one schedule instead of a shouted update.
Talk to us about thisManufacturing
A small manufacturing floor runs on a schedule that shifts every time a machine goes down or a supplier is late, and defect notes get written on paper if they get written at all. We build agents that replan the run, log the quality data and chase suppliers, so the schedule stays accurate without a whiteboard.
Job order changed on a machine fault or rush order automatically reflows the rest of the week, so the floor works off one schedule instead of a shouted update.
Talk to us about thisDefects captured by voice or photo on the floor, logged against the batch and job number, so root cause tracking does not rely on someone remembering later.
Talk to us about thisRaw material and component orders drafted against stock levels and lead times, with chase ups sent automatically when a delivery runs late.
Talk to us about thisMachine downtime, output counts and shift notes pulled into a daily report ready for the morning meeting, no spreadsheet required.
Talk to us about thisWhat it does
Why it holds up
Honesty
We tell you what AI can and cannot do, then we ship the part that pays for itself.
Craft
Production systems, not slideware. Built around how you actually work.
Speed
Find the one workflow costing the most, ship it to production, prove the return.
Care
Success is hours given back to people and dollars saved. Never the size of the invoice.
Questions
A job order change on a machine fault or rush order automatically reflows the rest of the week, so the floor works off one schedule instead of a shouted update.
Defects are captured by voice or photo on the floor and logged against the batch and job number, so root cause tracking does not rely on someone remembering later.
No. It replans the schedule and logs defects automatically, but the planner still makes the calls on priority. It removes the manual whiteboard rework.
Machine downtime, output counts and shift notes are pulled into a daily report ready for the morning meeting, no spreadsheet required.
Get in touch
Tell us what you’re trying to do and we’ll reply with how we’d build it, no obligation.
The schedule, quality log and supplier chasing run off floor data as it happens, so fewer jobs run late and defects get caught before they become a customer complaint.
Let’s talk